Browse the work done by month...
February 7, 2010

The engine bay is rapidly approaching a finished state, so it's time for a before and after shot. On the left is the engine bay pretty much as we pulled it out of the garage (the funnel was our addition!), still with the green ignition leads. Over the past (nearly) two years we've done a lot of work in it, as well as elsewhere on the car, having replaced wires, pipes, coil, plugs, points, filter, cylinders and loads of other parts.
A while back I inherited a 1979 MGB GT. It had been sat in a garage for nearly two decades and was in desperate need of a bit of attention. Knowing absolutely nothing about cars and even less about engines I, of course, decided to get it back on the road.